What does an engineering sapper company do. Organization of the fulfillment of the task by the commander of an engineer-sapper platoon to make passages in mine-explosive obstacles in front of the front line of enemy defense

Captain 2nd rank D. Rumynov

In the ground forces (SV) of Germany, the solution of the tasks of engineering support for combat operations is entrusted to the engineer-sapper battalions (ISB), which are part of the motorized infantry (tank and mountain infantry) brigades.

The conceptual documents regulating the degree of readiness and the procedure for engaging national military contingents determine that each of the two units (battalion tactical groups) simultaneously participating in two different operations outside the national territory should include an engineering and sapper company to ensure the overall and direct engineering support.

Based on an average four-month recruitment cycle for the Bundeswehr in international military contingents abroad, it may be necessary to recruit six units of this type during the year. Taking into account the need to provide a 20-month period of rehabilitation and training of personnel between participation in combat operations, it was determined that the ground forces should have 12 engineering and sapper companies.

As part of the reform of the armed forces of the FRG, engineering and sapper units are being transferred to a new standard organizational and staffing structure. Instead of the existing (as of the second half of 2014) one separate engineer-sapper regiment (three isb), four separate engineer-sapper battalions and five separate engineer companies, the new structure of the ground forces will include six of the same type deployed isb, two engineer-sapper companies (ISR), as well as two battalion-level field engineer units.

Prospective deployment of engineering units of the ground forces of Germany
Engineering troops in the prospective structure of the ground forces of Germany
Typical structure of an engineer battalion
Typical structure of an engineer company
Typical structure of a company of engineering vehicles

In accordance with the plans in the NE of Germany, by the end of 2015, the following will be disbanded:
- 100th engineer-sapper regiment (Minden), while the 1st engineer-sapper and 130th heavy engineer-sapper battalions included in it will be transferred to the 21st and 9th tank brigades (tbr), respectively, and the 901st engineer battalion of the reduced composition - under the direct subordination of the commander of the 1st tank division with the assignment of the name "heavy";
- 90th, 200th and 260th separate engineer companies.
Upon completion of the reform, each of the six brigades, which are the basis of the Bundeswehr ground forces, will include one engineer battalion:
- as part of the 9th tank brigade - 130 isb (deployment point - Minden, federal state of North Rhine-Westphalia);
- in the 21st tank brigade - the 1st engineer-sapper battalion (Holzminden, Lower Saxony);
- in the 41st motorized infantry brigade (mpbr) - 803 isb (Hafelberg, Saxony-Anhalt);
- in the 23rd mountain infantry brigade - the 8th mountain isb (Ingolstadt, Bavaria);
- the 4th engineer-sapper battalion (Bogen, Bavaria) will be included in the 12 brigade;
- to the 37th motorized infantry brigade - 701 isb (Gera, Thuringia).

The rapid reaction division and the Franco-German brigade will include, respectively, the 270th paratrooper (Seeddorf, Lower Saxony) and the 550th separate (Stetten am Kalten Markt, Baden-Württemberg) engineering companies.

In the divisional set of tank formations there will be two engineering and sapper units:
- 901st reduced heavy engineering battalion (Hafelberg, direct subordination to the commander of the 1st TD). The headquarters and support company included in it, as well as one of the companies of engineering vehicles, are rigged and do not have standard equipment; two heavy pontoon-bridge companies and a company of full-strength engineering vehicles are designed to be transferred, depending on the task, to any of the separate engineer-sapper battalions.
- 905th cadre engineer battalion (Ingolstadt, direct subordination to the commander of 10 TD), which included two cadre ISRs and one company of engineering vehicles. They are assigned to certain engineer-sapper battalions and, based on the current situation, can be transferred to their disposal.

After the reform, the total number of personnel of the engineering and sapper troops of Germany should be 3,950 people (up to 13.2% of the German ground forces, taking into account the military personnel of the training center for training specialists of the engineering troops).

In addition, the 164th (Husum, Schleswig-Holstein) and 464th (Speyer, Rhineland-Palatinate) special engineering battalions of the joint support forces of the Armed Forces of Germany.

According to the plans for reforming the armed countries, the 464th Special Engineer Battalion will be disbanded before the end of 2015.

Organizational and staffing structure of engineering and sapper units of the German ground forces. The typical structure of engineer-sapper battalions, which are part of motorized infantry (tank, mountain-infantry) brigades of the ground forces, involves the simultaneous allocation of the necessary forces and means (up to two reinforced engineer-sapper companies) for the engineering support of two independent operations. In turn, the regular structure of the engineering and sapper company, as well as the provision of its special equipment, must guarantee the involvement of this formation outside the national territory within four months.

The new standard structure of engineering and sapper units and subunits of the German Army was developed on the basis of six fundamental principles: - planning and organization of engineering support should be carried out at all levels (from battalion to divisional);
- the main unit intended for engineering support of hostilities is an engineer company, and when performing tasks related to bringing construction work, a company of engineering vehicles;
- in order to maintain 70% readiness of engineer-sapper companies for combat use in accordance with the new concept, the individual structural elements of the companies of engineering vehicles and pontoon-bridge companies allocated to them must undergo enhanced training;
- in the preparation of engineer-sapper companies and companies of engineering vehicles, increased attention must be paid to planning and conducting construction work;
- the fight against mines and improvised explosive devices is one of the main tasks of all engineering and sapper units (forces and means of demining are included in the engineering and sapper companies and companies of engineering vehicles);
- reducing the ability of engineering units to install mine-explosive obstacles.

Engineer Battalion according to the state, it is part of the motorized infantry (tank, mountain infantry) brigade of the German ground forces. The commander of the engineer battalion is the head of the engineering service of the brigade (operational formation) and is responsible for the following issues:
- organization of engineering support for the operation at the brigade level;
- planning, organization and execution of construction work in the area of ​​combat mission;
- Conducting engineering reconnaissance.

The engineer-sapper battalion organizationally includes an engineering work planning department, which includes an engineering reconnaissance platoon, as well as four companies: headquarters and support; two engineering sappers and a heavy sapper (company of engineering vehicles).

Engineer Intelligence Platoon ISS is designed to collect information about the terrain and infrastructure facilities necessary for planning an operation (combat actions). When performing reconnaissance tasks, a platoon can operate independently or in cooperation with reconnaissance subunits of motorized infantry (tank) brigades, as well as be assigned to combat companies in groups. Organizationally, it consists of a control group on the Fuchs-1 armored personnel carrier and four reconnaissance groups on the Fennec engineering reconnaissance vehicles. In total, there are 32 personnel in the platoon, one Fuchs-1 armored personnel carrier and four Fennec reconnaissance vehicles.

Engineering sapper company is the main tactical unit of the engineering troops, carrying out the appropriate support for the operations carried out by the ground forces to stabilize the situation at the level of the battalion tactical group, including:
- direct engineering support for combat units;
- clearing mine-explosive barriers in tactical depth;
- mine protection of combat units;
- ensuring that units can overcome natural obstacles up to 24 m wide;
- performance of construction works on the engineering equipment of the districts using engineering machines.

The engineer-sapper company organizationally includes an engineering work planning department, as well as four platoons - engineer-sapper, demining, heavy demining and engineering vehicles.

Engineer platoons engineer companies during the operation can be attached to combat companies, providing them with direct engineering support, or perform other specific tasks.

mine clearing platoons provide mine protection for units in tactical depth and check objects for the presence of mines and IEDs.
Heavy demining platoons in the prospective structure will be equipped with the new RCS demining system and will be able to perform the tasks of ensuring the unimpeded movement of military columns.

Company of engineering vehicles engineer-sapper battalion, along with the ISR, solves the tasks of engineering support for operations at the level of a battalion tactical group, such as:
- planning, organizing and carrying out construction work with the use of regular engineering machines;
- clearing mine-explosive barriers in tactical depth;
- mine protection of combat units;
- ensuring that units can overcome natural obstacles up to 40 m wide;
- restoration of infrastructure facilities.

A company of engineering vehicles organizationally includes:
- department of engineering work planning;
- Department of planning of construction works;
- engineering and sapper platoon;
- a platoon of engineering vehicles (protected), armed with automotive and special equipment with modular armor;
- a platoon of engineering vehicles (unprotected), equipped with equipment, without additional armor;
- demining platoon.

The above structures, being typical, have a number of differences in the number of engineer companies in individual engineer-sapper battalions, as well as in their composition. In particular, the 701st battalion of the 37th MBR in its permanent composition has not two, but one engineer company, and when performing assigned tasks, if necessary, instead of the missing second company, it can additionally include 550 squadrons of the Franco-German brigade (not involved brigade plan).

In contrast to a typical engineer-sapper company, this company has not one, but two engineer-sapper platoons and one (instead of two) demining platoon. It is armed with nine Fuchs armored personnel carriers, four Bieber tank bridge layers, three Dax sapper tanks, three Kyler tank minesweepers and six Scorpion mobile mining installations.

Thus, the 270th Airborne Engineering Company has four platoons (two light engineering platoons, a platoon of engineering vehicles and a demining platoon). It is intended for engineering support of the actions of the forces of the airborne brigade (parachute regiments) of the rapid reaction division, as well as operations carried out by special forces;

4 isb as part of a company of engineering vehicles has a platoon of drilling rigs. The main purpose of this unit is the development of water wells and the provision of water to the field camps of the Bundeswehr contingents in areas of combat use or during humanitarian operations.

The 4th, 130th and 803rd teams of engineering vehicles, which were previously part of the 4th, 130th and 803rd squads of engineering vehicles, equipped with FFB bridge layers, an FSB pontoon-bridge fleet (two pontoon-bridge platoons, platoons of engineering vehicles and divers) and a self-propelled pontoon park with M3 amphibious amphibious transporters (two pontoon- bridge platoons with M3 amphibians, platoons of engineering vehicles, divers-miners and a mine-clearing platoon) were transferred to the partially deployed 901st heavy engineer-sapper battalion.

Thus, due to the combination of the available forces and means of six engineer-sapper battalions, the creation of engineering units capable of performing the entire range of tasks of engineering support for operations carried out by contingents of German ground forces outside the national territory is achieved. If it is necessary to solve specific problems, they are given specialized engineering equipment from the 901st heavy isb.

Depending on the situation, when the Bundeswehr conducts an operation to protect the national territory or an operation within the framework of allied obligations, as well as in the course of measures to eliminate the consequences of natural disasters (man-made disasters), it is planned to create a single engineering unit on the basis of the 901st and 905th battalions, which will be used under a national plan or under coalition leadership.

The second essay on the military department.

1. Engineering troops, appointment

2. Tasks of combat engineering support

2.1 Engineer reconnaissance of the enemy and terrain

2.2 Fortification equipment of positions, areas, command posts

2.3 Arrangement and maintenance of engineering barriers, and destruction. Installation and maintenance of nuclear mines and land mines.

2.4 Destruction and neutralization of enemy nuclear mines. Making and maintaining passages in barriers and destruction. The device of passages through obstacles. Demining terrain and objects

2.5 Preparation and maintenance of the routes of movement of troops, transportation and evacuation

2.6 Equipment and maintenance of crossings when forcing water barriers

2.7 Engineering measures to camouflage troops and facilities

2.8 Engineering measures to restore the combat capability of troops and eliminate the consequences of enemy nuclear strikes

2.9 Extraction and purification of water, equipment of water supply points

2.10 Other tasks

3. The structure of the units of the engineering troops

3.1 The staff of the engineer company of the tank regiment (ISR TP)

3.2 The staff of an engineer company of a motorized rifle regiment (ISR MSP)

4. Military engineering terminology

Bibliography

Introduction

The engineering troops are a very remarkable branch of the troops. First of all, the engineering troops are the troops of the front line. Engineer units go into battle simultaneously with motorized rifle and tank units, and often even before them. It is no coincidence that in the Petrine Table of Ranks, officers of the engineering troops stood one rank higher than the infantry and cavalry.

Few people know that it was the engineering troops who were the first to master the latest means of warfare and introduce them into the army's arsenal. From the engineering troops, the railway troops, signal troops, automobile troops, tank troops stood out into independent branches of the troops. And the assertion that aviation was born in the bowels of the engineering troops will seem completely fantastic. And meanwhile it is. The task of creating and combat use, first aeronautic, and then aeroplane detachments, was assigned precisely to the engineering troops. Until the end of the First World War, aviation units remained under the jurisdiction of the Main Engineering Directorate.

Somehow unnoticed in the history of the Great Patriotic War is the fact that at the beginning of 1942 ten sapper armies were formed. One sapper army for each front. In 1943, the ranks of marshals and chief marshals were introduced not only for aviation, tank crews, artillery, but even for engineering troops.

The first military school in Russia for the training of officers was the school of the Pushkar Order, opened in 1701. This school trained artillery and engineer officers. In the infantry and cavalry, the first military educational institutions will be the cadet corps, which will open only 30 years later.

The engineering troops were born, based on the needs of artillery, in the bowels of artillery, and until the beginning of the 19th century they were an integral part of them.

1. Engineering troops, appointment

Engineer troops are designed to solve the problems of combat engineering support.

The Combat Charter of the Ground Forces of the Armed Forces interprets the concept of "Engineering Troops" as follows:

"Engineering support is one of the types of combat support. Engineer support for combat operations of troops is organized and carried out in order to create the necessary conditions for the troops to timely and covertly advance, deploy, maneuver, successfully carry out their combat missions, increase the protection of troops and objects from all types of destruction, to inflict losses on the enemy, to hinder the actions of the enemy.

Engineering support includes:

    engineering reconnaissance of the enemy, terrain and objects;

    fortification equipment of positions, lines, areas, command posts;

    the arrangement and maintenance of engineering barriers, and the production of destruction;

    installation and maintenance of nuclear mines and land mines;

    destruction and neutralization of enemy nuclear mines;

    making and maintaining passages in barriers and destruction;

    arrangement of passages through obstacles;

    clearance of terrain and objects;

    preparation and maintenance of troop movement routes, transportation and evacuation;

    equipment and maintenance of crossings when forcing water barriers;

    engineering measures to camouflage troops and facilities;

    engineering measures to restore the combat capability of troops and eliminate the consequences of enemy nuclear strikes;

    extraction and purification of water, equipment of points of water supply.

The tasks of engineering support are carried out by units and subunits of all military branches and special troops. They independently erect structures for firing, observation, sheltering personnel and equipment; cover with mine-explosive barriers and mask their positions and areas of location; lay and designate the path of movement; overcome barriers and obstacles; forcing water barriers.

Engineer troops perform the most complex tasks of engineering support, requiring special training of personnel, the use of engineering equipment and specific engineering ammunition. In addition, they inflict defeat on enemy equipment and personnel with mine-explosive and nuclear-mine weapons.

2. Tasks of combat engineering support

2.1 Engineer reconnaissance of the enemy and terrain

The expression "It was smooth on paper, but they forgot about the ravines" is well-known. This is not a general aphorism, but a sad reminder to many commanders of times past and present. A historical fact - one of the reasons for Napoleon's defeat at the Battle of Waterloo was the death of a cuirassier division in a ravine on the way of their brilliant attack on the British flank. Wellington covered the flank of the army with a ravine. Napoleon could not see this ravine, and he decided to take advantage of the fact that the English commander "stupidly" left his flank open for a strike. At full gallop, the French cuirassiers flew into this ravine, and most of them were maimed and killed. The attack was thwarted.

One can cite hundreds of examples when the neglect of engineering intelligence thwarted the most excellent plans of the generals, turned the advancing troops into a target for the enemy.

Engineering reconnaissance of the area is carried out in various ways and methods (study of the area using a map, aerial photographs, military geographical descriptions; observation, engineering reconnaissance patrols, etc.).

The result of engineering reconnaissance of the area is the answer to the question of the terrain passability for personnel and equipment, the possibility of masking personnel and equipment (both one's own and others). To do this, you need to get information about the terrain (for example, the steepness of the hills); availability and capacity of roads; about the possibility of off-road driving (whether the area is swampy, whether the snow is deep, whether there are ravines); about the presence of water barriers (rivers, streams, lakes, flood zones); about the density of forests and their fire danger.

In general, the terrain on which the fighting is coming should be carefully studied and understood - how it can affect the solution of combat missions. Without this, any most cunning battle plans will turn out to be just searchlights and the troops will be defeated.

Naturally, the enemy is also studying the area and trying to hinder the actions of our troops. To this end, the enemy is carrying out a number of measures to worsen the possibilities for the movement of our troops. He destroys or prepares for the destruction of roads, bridges, dams, arranges forest blockages, tears off anti-tank ditches, arranges barricades, sets minefields, constructs pillboxes, bunkers, armored caps, and tears off trenches. Engineering reconnaissance is obliged to detect these enemy measures and to predict enemy actions.

The methods of conducting engineering reconnaissance depend on the type of battle or maneuver to be carried out (offensive, defense, retreat, march). To conduct engineering reconnaissance in units and subunits, engineering observation posts (INP), engineering reconnaissance patrols (IRD), photography posts (PF), engineering reconnaissance groups (IRG), deep reconnaissance groups (GGR), helicopter patrols (VD), radar surveillance posts (PRN). To conduct engineering reconnaissance, vehicles specially designed for this purpose are used, for example, the IRM engineering reconnaissance vehicle.

Usually these posts and groups are created by engineering units of a motorized rifle (tank) division, corps, army, front. In motorized rifle (tank) regiments and battalions, engineering reconnaissance tasks are usually assigned to ordinary reconnaissance posts and groups. To do this, soldiers or sergeants of the engineer company of the regiment are included in the posts and groups.

A very simple example - a flat green field lies in the path of an offensive of a tank regiment. The regiment commander is interested in whether the tanks will pass there. Engineering intelligence is obliged to give an accurate and unambiguous answer - yes or no. Indeed, under the green carpet of grass, anti-tank mines or an impenetrable swamp can lurk. What happens if intelligence is wrong is not difficult to predict. But how to reconnoiter if this field is under the guns of numerous enemy snipers and machine gunners, mortar and artillery fire? Sappers show ingenuity, risk their lives, suffer losses, and finally give an accurate answer. Sappers, under enemy fire, make passages among enemy mines, lay a path through the swamp. The regiment is successful. All glory to the tankers. After all, they won the fight. What about sappers? They were again forgotten, although the regiment owed much of its success to them.

2.2 Fortification equipment of positions, areas, command posts

Fortification equipment is one of the most important elements of combat engineering support. This includes excerpts of trenches for shooters, military equipment, equipment of shelters for equipment, shelters for personnel, communication channels (trenches), equipment of observation and command and observation posts.

A significant part of the work on fortification equipment is carried out by the personnel of motorized rifle (tank) units, units of other troops. The role of even the simplest fortifications in achieving victory in battle is very great. Suffice it to say that losses from enemy fire of covered infantry are 4-6 times lower compared to uncovered infantry, and 10-15 times lower from nuclear weapons.

Work on the fortification equipment begins immediately after the occupation of the given area by the unit and the organization of the fire system. They continue as long as the unit occupies the area. These jobs are very labor intensive and time consuming. Suffice it to say that even a section of a submachine gunner's trench for prone shooting takes from 25 to 40 minutes. To excavate a trench for a tank, it is required to move up to 28 cubic meters. earth. If we take into account that the tank crew consists of three people, then each of the tankers must move 9 cubic meters. soil. One person per hour, working in medium soil, can move up to 1 cubic meter. This means that it will take from 10 to 30 hours to manually open a trench for a tank. But it's worth it. A tank in a trench successfully deals with three or four advancing enemy tanks.

In a number of cases (hurried defense, proximity of a suitable enemy, etc.) there is no time for this. To reduce the time of fortification of positions, engineer troops are involved. So, the engineering company of a tank regiment for these purposes has nine BTUs (bulldozer equipment mounted on a tank), i.e. one BTU per tank company. This equipment allows you to open one tank trench in 30 minutes (plus another 5 man-hours of work with shovels). In addition, in the engineering and sapper company there is a PZM machine (regimental earthmoving machine) for extracting trenches, pits for dugouts, shelters, shelters for equipment. It tears off a trench at a speed of up to 300 meters per hour; when excavating pits, its productivity is 150 cubic meters. per hour (for comparison - an excavator is only 40). The capabilities of the engineer-sapper battalion of the division are much higher. In addition, the front usually has one to three specialized fortification battalions. There, in particular, there are machines of the BTM type (Fig. 2), which tear off a trench at a speed of up to 900 meters per hour; MDK, which tear off a trench for a tank in 8-10 minutes.

Fig. 2 Fast trenching machine (FTM).

1- lifting winch; 2 buckets with teeth; 3-reflector soil; 4-conveyor;
5- toothed rack; 6- track roller; 7-sweep shoe (a device that cleans the bottom of the trench); 8 - rotor roller; 9- sloper;
10- rotor; 11- reducer.

In order to ensure the possibility of quickly building shelters for personnel, the engineering troops have not only earthmoving equipment, but also ready-made sets of dugout and shelter elements, as well as sawmilling and forestry tools for working on the front line or near it. They also have the means and capabilities to build these shelters and trenches directly under enemy fire. For example, a trench charge (OZ) allows using a directed explosion in 2-3 minutes to open an explosive trench for a shooter to shoot while standing (depth 1m.10cm.).

In addition to trenches and shelters, a large number of other structures are being built in the defense area of ​​motorized rifle and tank subunits and artillery. These are, first of all, observation and command and observation posts, which differ slightly from shelters and trenches (for example, a sheltered observation post is a dugout with a periscope installed inside; an open KNP of a regiment commander is a section of a trench with cells for staff officers, several shelters for radio stations, one shelter).

2.3 Arrangement and maintenance of engineering barriers, and destruction. Installation and maintenance of nuclear mines and land mines.

The arrangement and maintenance of engineering barriers is one of the main tasks of the engineering troops. Everyone is somewhat familiar with this part of the combat activities of the engineering troops. First of all, this is the installation of minefields. Minefields play a very significant role in covering troop positions from enemy attacks. Many years of experience in warfare shows that the mine danger can greatly influence the actions of the enemy. Mines do not cause real harm to the enemy so much as they affect the psyche of the personnel. Experience shows that it is enough to detonate two or three tanks on the mines to completely disrupt the attack of a tank company. The experience of the war in Afghanistan testifies that it was enough to detonate one car on the road with a mine in order for the speed of the column of our troops to decrease to 1-2 kilometers per hour. Then the speed of movement was determined by the ability of sappers to check the road for the presence of mines. In the combat regulations of a number of countries there is the term "mine warfare". The massive use of mines can almost completely paralyze any combat activity of enemy troops in a given territory.

At present, the mine danger is enhanced by the fact that the development of technology and electronics makes it possible to create almost intelligent mines. It is a reality that a mine does not react to a soldier of its own army, a civilian, but instantly works when an enemy soldier approaches and explodes at the most favorable moment. In addition, today there is not a single sufficiently reliable way to detect mines, and even if a mine is found, there are no ways to reliably neutralize them. Mines can have sensors recognizing - this is a target or a mine trawl, they can recognize the significance of a target, they can have a multiplicity device (skip a certain number of targets and explode under the next one). Mines can be transferred to a combat or safe position by radio signal, or self-destruct. For the installation of minefields or individual mines, the presence of a sapper at the installation site is not at all necessary. Mines can be placed remotely (not even enemy territory can be thrown with the help of artillery or aircraft). Minami can cover very large sections of the front in a very short time. If in the early sixties a sapper company could lay one kilometer of a minefield overnight, now it is up to 10-15 kilometers in an hour.

In the recent past, in order to lay mines in front of their front line, sappers had to crawl out at night to no man's land and lay mines under enemy fire. Now this can be partially avoided through remote mining systems. However, these systems place mines on the ground, which allows the enemy to frequently locate and destroy the mines.

Minefields must not only be established, but also maintained. The maintenance of a minefield includes monitoring its condition, laying new mines to replace those that have exploded, protecting the field from mine clearing by the enemy, fencing the field with signs so that mines do not blow up their cars or personnel, timely removal of these signs, transferring the minefield to combat or a safe state (if the minefield is set to be controlled), opening and closing passages in the minefield, allowing friendly troops through the passages.

Motorized rifle and tank units can lay some minefields themselves, but this type of combat is too specific, requires special knowledge, and therefore, as a rule, only engineering troops are engaged in minefields. To accomplish this task, an engineering and sapper company of a motorized rifle (tank regiment) has a sapper platoon, armed with three trailed minelayers (PMZ) and three Ural or KAMAZ vehicles. A platoon is able to set up an anti-tank minefield one kilometer long in 15-20 minutes. The engineering troops are armed with anti-tank, anti-personnel, object (for mining buildings and other structures), automobile (for mining roads), railway, anti-landing (for mining water barriers), anti-aircraft (mining runways of airfields), booby-traps, mines -surprises.

A special type of engineering mines are nuclear mines. The engineering troops are armed with portable nuclear land mines weighing about 60 kg. and capacity from 500t. up to 2 thousand tons TNT equivalent. With the help of nuclear land mines, not tactical, but large operational-strategic tasks are solved. With their help, continuous lines of nuclear minefields are created, very large bridges, dams, hydroelectric facilities, and railway junctions are destroyed.

However, the combat use of engineering troops is not limited to mines. Engineer troops also construct non-explosive barriers (barbed or cutting wire, anti-tank ditches, scarps and counter-scarps, barricades, blockages on roads, swampy and flooded areas), produce various destruction to hinder the advance of the enemy (destruction of roads, bridges, blockages on roads); destroy infrastructure (destruction of buildings, railway and road structures, water supply systems, gas supply, electricity supply, fuel tanks, oil fields). To perform these tasks, the engineering troops have various explosives, special engineering ammunition (charges of various capacities and methods of actuation).

The engineering troops solve the tasks of destruction and mining not only on their own territory when preparing the area for defense, but also on the territory of the enemy in order to make it difficult for the enemy to fight, inflict losses on him, make it difficult or impossible for him to maneuver (withdrawal, transfer of units to threatened areas, transportation ammunition, the approach of reserves).

Very often, the main task of subunits and units of the airborne troops or special forces units is precisely the creation of conditions for the successful fulfillment by engineer troops of the tasks of causing harm to the enemy. For example, special forces capture and hold an important bridge for several hours so that sappers can blow it up.

2.4 Destruction and neutralization of enemy nuclear mines. Making and maintaining passages in barriers and destruction. The device of passages through obstacles. Demining terrain and objects

All these activities are directly opposite to those mentioned above. Actually, this is the direct clash of the engineering troops of the opposing armies. Some mine, others mine; some are blocking, others are blocking.

In general, the idea of ​​using nuclear mines was born within the walls of NATO in the late sixties and early seventies. The brilliant operation of the Soviet Army to occupy Czechoslovakia in August 1968 showed that the USSR was in a position to carry out a "blitzkrieg"; that NATO troops will not have time to react in the event of an attack by the Soviet Army, that it is able to covertly concentrate an attack force in a very short time, and make a rapid advance to anywhere in Europe.

In order to be able to delay the advance of the Soviet Army and give NATO troops time to turn around, it was proposed to create a so-called nuclear mine belt along the borders of the FRG. It was understood that if all the charges of this belt were detonated at the same time, a zone of radioactive contamination would be created, which would make it possible to delay the advance of Soviet troops for two to three days. This time will be enough for the deployment of NATO strike groups.

The task of neutralizing or destroying enemy nuclear mines was assigned to the engineering troops. By the way, it was precisely in connection with this that the very rapid creation of special forces units in the Soviet Army began. Initially, they were created only for this purpose, in order to reconnoiter the places where nuclear mines were laid, to destroy the personnel of command posts, and to provide the engineering troops with the opportunity to destroy or defuse nuclear mines.

At present, the task of both installing and destroying nuclear mines has lost its relevance. The use of nuclear mines by both sides is a big question. However, the engineer-sapper battalion of the tank (motorized rifle) division still has a platoon of reconnaissance and destruction of nuclear land mines (VRUYAF).

The main task of the engineering troops in this area, as in the years of the Second World War, is to make passages in the minefields and obstacles of the enemy, clearing debris and destruction to ensure the movement of their troops, clearing the area, buildings, roads, airfields, railway stations, streets etc.

This is exactly the side of the combat activity of the engineering troops when they say: "For the engineering troops, the war never ends." After the end of the war, a huge number of minefields, mined objects, unexploded artillery shells, and bombs remain. All this creates a threat to the lives of the civilian population, makes it impossible to use objects and terrain. In peacetime, one of the main tasks of the engineering troops is to eliminate this danger. Its implementation has been delayed for many decades.

In combat conditions, it is the engineering troops that begin the attack. They make passes in the enemy's obstacles in front of his front line and in the depths of the defense, provide motorized riflemen and tankmen with advance. During the Great Patriotic War, perhaps the only way to make passages in minefields was to manually remove the mines by sappers on the night before the attack. It was the capture of a German sapper on the night of July 5, 1943 that allowed Marshal Zhukov to determine exactly the hour of the start of the Nazi offensive on the Kursk Bulge.

Currently, there are a number of ways to make passages in enemy minefields. So, for making passages, the engineering and sapper company of the tank regiment has three KMT-5M trawls (skating rinks) and 27 KMT-6 trawls (knife). These trawls are hung on tanks, which can overcome minefields, and the rest of the tanks follow in their footsteps.

In addition, the engineering battalion of the division has demining installations UR-67, UR-77. They are lightly armored vehicles carrying rockets with hoses attached to them that are filled with explosives. Before the start of the attack, these vehicles launch rockets that throw hoses with explosives into the minefields. When these hoses explode, the mines detonate and passages are formed. Further, mine-clearing installations advance in the battle formations of tanks and, when minefields are found in the depths of the enemy’s defense, they make passages in them.

To overcome anti-tank ditches, water barriers up to 20 meters wide, the engineering troops have tank bridge layers of the MT-55 type. This is a tank-based vehicle with a 20 m long metal bridge on top instead of a tank turret. In 2-3 minutes, the vehicle crew installs the bridge without leaving the vehicle.

For wider barriers, engineering troops have a heavy mechanized TMM bridge (Fig. 3). These are 4 KRAZ-255 vehicles, with 10 meters of a bridge with rigid supports placed on each of them. In 20 minutes, TMM can install a bridge 40 meters long.


Fig. 3 Heavy mechanized bridge layer (ТММ).

1 - initial position of the bridgelayer; 2,3 - sequential opening of the folding bridge.

For making passages in the rubble, the engineering and sapper company of the regiment has one powerful bulldozer BAT-2. It is capable of laying a column track at a speed of up to 5 km / h.

2.5 Preparation and maintenance of the routes of movement of troops, transportation and evacuation

The existing network of roads built in peacetime, as a rule, does not satisfy the needs of the troops. Firstly, this network is known to the enemy, which means that it is under constant surveillance, shot at, the structures on it are destroyed. Secondly, the directions of the roads often do not correspond to the location of the troops and their tasks. For example, according to the charter, the regiment's defense section has a length of 10-15 kilometers along the front. To ensure the supply of food, ammunition, the evacuation of the wounded, the maneuver of units, the regiment needs one rocade (road) along the front at a distance of 4-6 kilometers from the front edge 15-18 km long, and a regimental frontal road (from the rear to the front edge) 10- 15 km. In addition, roads are required to the defense areas of the battalions, to the strongholds of the companies.

Engineer troops prepare and maintain these routes. Of course, these are not the roads that people are used to in peacetime. More often, these are simply directions of movement marked on the ground with arranged transitions through difficult-to-pass places (crossings through ravines, streams, smoothed steep ascents and descents, passages in rubble). Of particular importance is the laying and maintenance of traffic routes in winter. Also, a great difficulty in solving the problem of maintaining the paths of movement is the masking of these paths. Opening the network of routes by the enemy means opening the entire defense system of our troops.

To solve this problem, the engineer-sapper company of the regiment has a BAT-2 track-laying machine, chain saws and other tools.

It should be borne in mind that these works are carried out in the zone of artillery, mortar fire, and often enemy small arms. In cases of active enemy action, IMR vehicles can be brought in from the engineer-sapper battalion of the division to solve these problems. The base of this machine is a tank with powerful bulldozer equipment and a manipulator (mechanical arm) with a carrying capacity of 2 tons.


2.6 Equipment and maintenance of crossings when forcing water barriers

One of the most difficult tasks during the offensive of troops is the forcing (overcoming) of water barriers (rivers, lakes, reservoirs). Usually they are used by the enemy as the basis of a defensive line. Very often, the offensive of troops began by forcing water barriers, or it ended with access to a water barrier.

With the advent of amphibious armored personnel carriers and infantry fighting vehicles in service with our army, the task of forcing water barriers, especially wide ones, did not become easier. The troops have a lot of equipment that is not capable of swimming, but without which it is impossible to conduct a further offensive (tanks, artillery pieces, motor vehicles, etc.). And the banks of the rivers do not always allow floating cars to go down to the water or go ashore.

To solve the problems of equipment and maintenance of crossings, engineering troops are involved. For these purposes, there are crossing and landing battalions, pontoon bridge battalions and regiments, bridge-building battalions and regiments.

The amphibious assault battalions are armed with tracked amphibious transporters PTS-2. This vehicle is able to transport 72 infantrymen, or a gun with a caliber of up to 203 mm, or a Ural-type vehicle through a water barrier of any width at a speed of 10 km / h. The carrying capacity of the PTS-2 on the water is 10 tons. This machine is able to sail on the sea with waves up to 4 points.

For crossing water barriers tanks, self-propelled guns and other tracked vehicles weighing up to 52 tons, there are GSP tracked self-propelled ferries (Fig. 5).


Fig.5 Caterpillar self-propelled ferry (GSP).

1- ramp of the right semi-ferry; 2- boat of the right semi-ferry; 3- leading machine of the right semi-ferry; 4- wave guard; 5- transported equipment.

These vehicles on the march follow in a tank column and solve the problem of crossing heavy equipment. Afloat speed 10km/h. The tank on the ferry can fire.

For crossing water barriers up to 227 meters wide, the engineering troops have a PMP pontoon park. From the set of this park, transported on 32 Kraz vehicles, a floating bridge with a carrying capacity of 60 tons and a length of 227 meters or a carrying capacity of 20 tons and a length of 382 meters is assembled in 15-30 minutes. Ferries of various carrying capacity (from 10 to 300 tons) can be assembled from these pontoons to transport troops across wider barriers. To tow these ferries, the pontoon battalion has 12 boats.

For the installation of stationary crossings, crossings over obstacles where it is impossible to use floating equipment, USM bridge construction installations are used, which make it possible to build a wooden 60-ton. bridge on pile supports at a speed of up to 60 meters per hour.

There are pontoon parks (PPS) in the engineering troops that make it possible to build pontoon railway bridges across rivers.

All these units of the engineering troops in peacetime are constantly involved in rescuing people and material assets during floods.

2.7 Engineering measures to camouflage troops and facilities

Camouflage is a set of measures designed to hide from the enemy the presence and location of our troops, the actions and intentions of our troops, or to mislead the enemy about the number, actions, location, intentions of our troops. The purpose of camouflage measures is to force the enemy to deploy his troops in the most unfavorable way for him, in the most unfavorable places for him, to force the enemy to strike at empty places, to expose the enemy to the blows of our troops.

Disguise can often play a decisive role in achieving success in battle, in winning the whole battle. When the command of the Red Army during the Great Patriotic War was able to fully appreciate the role of camouflage and widely deploy camouflage measures in the preparation of hostilities, they were able to achieve decisive successes.

Thus, the measures taken managed to hide from the Germans the construction of a railway on the left bank of the Volga to Stalingrad, which made it possible in a short time to transfer and concentrate a large number of troops near the city. The reports of their intelligence officers about the concentration of Soviet troops near the city were regarded by the German command as misinformation. They knew that the command of the Red Army had nothing to transfer many troops there, and the new railway, along which the transfer was going on, was reliably hidden from German air reconnaissance.

During the preparation of the defense on the Kursk Bulge, the engineering troops created a huge number of false objects (trenches, tank trenches, airfields, roads, places of concentration of troops, tanks, artillery). German reconnaissance, air reconnaissance, stumbling upon these false objects along with genuine ones, reported to their command, and the Wehrmacht High Command decided that the Red Army, guessing about the intention of the Germans to strike near Kursk, was trying to mislead them and give the impression that the Soviets had a sufficient number of troops near Kursk. Meanwhile, the Red Army did create a large grouping of troops there, but it was hidden among a huge number of false objects.

Therefore, camouflage is divided into strategic, operational and tactical. Engineer troops carry out only their part of camouflage measures. For this purpose, there are camouflage battalions in the RGK (reserve of the main command). One such battalion, with the help of the means at their disposal, can deploy to a false tank corps.

For example, up to 20 inflatable rubber tanks are transported on one vehicle. Such a rubber tank is inflated in 5-7 minutes from a car compressor and becomes indistinguishable from a distance of 200-300m. from the real look, and the metallized coloring gives exactly the same mark on the locator screen as from a real tank. The same machine can tow these inflated tanks behind it, giving the impression of two tank companies moving forward. The imitator installed on the same vehicle creates on the air the impression of a lively radio exchange of a tank column.

Camouflage nets are gradually becoming a thing of the past. The fact is that modern means of even optical reconnaissance make it possible to very clearly distinguish artificial greenery against the background of natural greenery and it is no longer possible to hide objects behind nets. Moreover, it is impossible to hide the pontoon bridge on the river. But deploying a few false bridges and hiding the real one among them is relatively easy. The enemy will be forced to disperse his forces to destroy all the bridges in a row, which will drastically reduce the effectiveness of strikes.

The engineering troops are armed with various simulators of the operation of radio equipment, simulators of infrared radiation of objects, radar reflectors, and easily assembled sets of false objects (equipment, buildings, bridges). For example, a camouflage airfield platoon deploys a false military airfield with imitation of a fighter air division based on it in 1-2 days on unprepared terrain. Moreover, not only ground objects and aircraft on the ground are simulated, but also aircraft flights near the airfield.

In general, a battle is not only a confrontation between means of attack and means of defense, but also a confrontation between means of reconnaissance and camouflage. If you do not know where to strike, and the enemy knows where your forces are, then you will surely lose the battle.

2.8 Engineering measures to restore the combat capability of troops and eliminate the consequences of enemy nuclear strikes

Fortunately, the engineering troops never had to perform this task. To some extent, its implementation can be compared with the work of rescuers of the Ministry of Emergency Situations in areas of earthquakes, floods, large fires, landslides, avalanches, man-made disasters, plus radioactive contamination of the area. Only for a more accurate comparison it is necessary to imagine all these events as having happened simultaneously. But these tasks must be carried out in conditions of combat operations and in conditions of an acute shortage of time.

If we decompose these tasks into their components, then the implementation of these components includes: engineering reconnaissance of the enemy, terrain and objects; restoration and maintenance of engineering barriers; making and maintaining passages in barriers and destruction; arrangement of passages through obstacles; restoration and maintenance of troop movement routes, transportation and evacuation; restoration and maintenance of crossings through water barriers; engineering measures to camouflage troops and facilities; etc. tasks.

2.9 Extraction and purification of water, equipment of water supply points

In fact, this is more of a task for the rear services, but all attempts to transfer the solution of this task to them instantly led to a disruption in the supply of water to the troops. So it was in 1939 in the battles on the Khalkhin Gol River, during the Soviet-Finnish war of 1940, and so it happened in 1945 during the movement of Soviet troops through the Gobi desert. In the end, it was decided that the supply of drinking water to the troops was not a matter of logistics, but of combat support, because. the lack of water by the end of the third day led to heavy losses in personnel.

One should not think that the issue of water extraction and purification plays a significant role only in desert conditions in summer or in Arctic conditions in winter. People who are accustomed to the fact that at any moment you can open a tap and clean drinking water will flow from it, or at worst take buckets and go with them to the well, it is difficult to imagine the problem of drinking water. But imagine a village with one well into which a regiment entered. One soldier needs from 8 to 15 liters of drinking water per day. The regiment consumes about 8-10 tons of clean water per day. The well will be empty in the first half hour, and people need to drink, eat, wash. Where to get water? But we need not just water, but clean drinking water.

To solve this problem, the engineering troops have a large arsenal of technical means for extracting and purifying water. For the extraction of water from underground, for small units there are manual drilling devices (MTK) for drilling wells up to 8 meters deep and pumping water out of them. There are mechanized devices for drilling wells up to 200 m deep, various means (pumps) for lifting water. For water purification, there are small-sized filters that can provide clean water to small units directly in positions.

To provide the regiment with water, the engineering and sapper company includes a field water supply department, which is armed with a MAFS or VFS-2.5 vehicle. The MAFS machine is capable of purifying 5 tons of water in an hour, regardless of its initial contamination (it also purifies water from radioactive contamination). For areas where there is no dirty but unsalted water, there is a FOU machine capable of desalinating up to 400 liters of sea water per hour.

2.10 Other tasks

In addition to solving the immediate tasks of combat engineering support, the engineer troops are entrusted with the task of providing other branches of the military with trenching tools, electrical equipment (from flashlights and batteries to mobile nuclear power plants), and supplying units and subunits with electricity. To do this, the engineering troops have mobile power plants with a capacity of 500 watts to 5 megawatts.

3. The structure of the units of the engineering troops

At present, the engineering troops of the Russian Army consist of units and units that are part of motorized rifle (tank) regiments and divisions; engineering units that are part of army corps, armies, districts, as well as engineering units and formations reporting directly to the General Staff of the Russian Armed Forces.

The staff of a motorized rifle (tank) regiment has an engineer-sapper company (ISR).

The staff of a motorized rifle (tank) division has an engineer-sapper battalion (ISB). The staff of the army corps also has an engineer-sapper battalion, but its staff and capabilities are somewhat wider than those of the ISF division.

An army, depending on its composition and combat missions, depending on the theater of operations, may have one or more ISF or an engineer regiment (ISP). In addition, the army may have a pontoon-bridge battalion (OPOMB), several specialized battalions.

However, most often, specialized engineering battalions and regiments, as well as brigades, remain under district or central subordination, located on the territory of the districts. These engineering units are usually deployed in those areas where their use is most possible. These are pontoon regiments (OPOMP), crossing and landing battalions (ODESPB), assault and obstacle engineering battalions (IBSHIR), engineering barrage battalions (OIZB), camouflage battalions (OMB), bridge-building battalions, road battalions, command post equipment battalions (OBOPU ), engineering and fortification battalions (OIFB), battalions and companies of field water supply; platoons, companies and battalions of special mine clearance, units and units of mine clearance, units and units of special use.

In a number of cases, engineering units are reduced to engineering brigades. There are currently no larger engineering brigades in the engineering troops, and their existence is impractical. For example, an engineering team is deployed near each nuclear power plant to eliminate the consequences of nuclear accidents.

3.1 The staff of the engineer company of the tank regiment (ISR TP)

The engineer-sapper company of a tank regiment belongs to the combat support units and is designed to perform the tasks of engineering support for the regiment's combat (Scheme 1).

The direct head of the company is the head of the engineering service of the regiment, who in turn reports directly to the commander of the regiment. Fortification - a branch of military engineering that deals with the theory and practice of improving terrain for combat by engineering methods.

Military fortification - the main means of fortification equipment of the area.

trench called an open earthwork for firing. A trench is for a shooter, machine gun, grenade launcher, mortar, gun, tank, infantry fighting vehicle (IFV), armored personnel carrier (APC), anti-aircraft gun, etc. In a word, for everything that can shoot. Very often, a trench for a tank is mistakenly called a caponier. This is completely wrong. This word came to literature from the times of forts and fortresses. A caponier is a concrete or brick structure adjacent to the fortress wall and designed to fire along the walls of the fortress to destroy enemy soldiers who have broken through directly to the walls. If the caponier allows you to fire not in two directions, but in one, then it is called a semi-caponier.

For non-firing equipment (cars, communication vehicles, field kitchens, ambulances, etc.), personnel are being built shelters . Their difference from the trenches is that it is impossible to fire from them. In some cases, shelters can also come off for firing equipment. Thus, a tank cover differs from a tank trench only in its depth (the tank hides in the cover completely to its full height).

Various shelters are also being built to shelter personnel. But, if all shelters for equipment are called "shelter", then for personnel their names are different.

gap used for sheltering a motorized rifle squad (and for other small units). Outwardly, it looks like a short section of the trench. The gap can be open and blocked (covered from above with thin logs (knurling) and sprinkled with a layer of earth of 30-60 cm). The gap must accommodate at least 1/3 of the squad personnel.

Dugout is a completely buried, earth-covered structure made of logs, shields, or elements of corrugated iron. The dugout is covered from above with one or several rows of knurling and covered with a layer of earth of at least 1m.20cm. Inside, bunks for personnel rest are equipped, a heating stove is installed, and electricity can be supplied. Very often a dugout is mistakenly called a dugout. This is fundamentally wrong. Dugouts, unlike dugouts, are a surface structure, arranged in the rear areas; they are not designed to shelter personnel from enemy fire. Dugouts are intended for long-term residence of personnel and are something like large huts made of logs covered with a thick layer of turf. Dugouts can have a capacity of up to 100 or even 200 people, while a dugout can accommodate up to 13 people. According to the norms, one dugout per platoon is equipped and should accommodate 1/3 of the platoon. The dugout is not intended for firing. Structures similar to a dugout, but equipped with one or more embrasures, are called DZOT (wood-earth firing point) or DZOS (wood-earth firing structure). The same structure, but made of concrete, is called a bunker (long-term firing point) or DOS (long-term firing structure).

asylum similar to a dugout, but larger, goes deeper into the ground than a dugout, has a thicker protective layer of earth and is completely sealed. Those. poisonous substances, incendiary agents cannot penetrate inside the shelter. The shelter is equipped with a filter-ventilation unit; in the shelter you can be in a poisoned zone, a zone of radioactive contamination, without wearing gas masks. The shelter is equipped with one per company and must accommodate at least 1/3 of the company's personnel.

Message moves - these are trenches connecting the trenches of units or trenches leading to the rear (for carrying out the wounded, delivering ammunition, food, replenishment). Also in the defense area, shelters are being built for the wounded, for medical posts, communications equipment, water supply points, field warehouses, food points, etc.

Engineering ammunition , means of blasting, explosive charges (HE), mines, pyrotechnic devices and other items of engineering weapons equipped with explosives and pyrotechnic compositions. The means of blasting are blasting caps, electric detonators, electric igniters, fuses, detonating and igniter cords, incendiary tubes, fuses, etc. Explosive charges are used to produce destruction, construct barriers and perform other tasks related to the engineering support of military operations. The main means for these purposes are mines, as well as shells of engineering cable throwers (devices for throwing cables), and in some armies - nuclear mines.

Original taken from onepamop in Pro Guards Assault Unit of Engineering Troops

On December 1, 2014, in the city of Murom (Vladimir region), they began to form an engineering and sapper brigade of central subordination. The brigade was formed in order to increase the capabilities of engineering troops and the efficiency of their use, create a reserve for solving suddenly arising tasks and strengthen groupings of troops in strategic directions. The brigade is in the reserve of the Supreme Commander.

As part of the brigade, for the first time since the Great Patriotic War, the assault and barrage battalion was revived, designed to ensure the unhindered movement of general-purpose forces in urbanized areas, which can significantly increase the efficiency of actions during the assault on buildings, while avoiding losses as much as possible.

This time we managed to observe the work of the "stormtroopers" with a "watering can" and a notebook. From personal impressions: one of the most interesting of my army races.


By pressing the buttons, you help in the fight

Senior Lieutenant Dmitry Anatolyevich F., commander of the assault and barrage company of the 1st Guards engineer-sapper Brest-Berlin Red Banner Orders of Suvorov and Kutuzov Brigade, answers our and your questions.
It was not possible to squeeze all the questions into one interview, but there is an opportunity to leave questions in the comments and get an answer to them!

1. Very briefly about myself
I always wanted to serve in the army, I have been in military service since 2005. He graduated from a military school in St. Petersburg and, by the will of fate and his own, ended up in the ranks of the 1st Guards engineer-sapper Brest-Berlin Red Banner Orders of Suvorov and Kutuzov Brigade. Our brigade of central subordination was formed on December 1, 2014 in the city of Murom (Vladimir region). I am satisfied with the service in the brigade, this is exactly what I like to do.

2. Since time immemorial, there have been rumors that engineering troops are only needed to build bridges and install / remove mines. Still, they say, you can involve them in digging everything. What else is included in the range of real tasks of modern engineers?
Engineering troops, of course, not only build bridges, lay and remove mines. We are engaged in fortification, engineering reconnaissance of the terrain, we can equip approaches and lines for the convenience of our troops or make them unsuitable for advancing enemy troops, make a passage in minefields or secure an entire direction for the maneuver of our troops. Building bridges and crossings over water barriers is also our area of ​​responsibility. In addition, military engineers provide troops in the field with electricity and water, including drinking water. We can greatly complicate enemy reconnaissance actions: where necessary, military engineers use camouflage and concealment of important objects or, conversely, imitation and arrangement of false objects, for example, using inflatable models of military equipment. We operate on land and at sea, in addition to army engineering and sapper units, there are also naval or naval engineering units in the engineering troops.

3. What is the task of the assault unit of military engineers?
The immediate tasks of my particular unit are blockade and assault. Barrage, simply put, is the elimination of enemy obstacles (including mined ones) by various methods, and assault is the destruction of the enemy in fortified points and entire areas. Plus, ensuring the unimpeded movement of infantry, artillery, tankers and other forces following us through the territory of the enemy.

Units like ours were widely used in the Red Army during the Great Patriotic War, there is enough information on them. Modern military conflicts, of course, differ markedly from the situation on the fronts of the Great Patriotic War, but there are also many common features. The creation of assault units is the call of the times and an adequate response to modern military realities.

4. What is the specificity of "stormtroopers"? Are there units with similar specifics in the RF Armed Forces?
It turns out that the specifics of assault engineers also include part of the work performed by special forces units, some of the tasks are consonant with those set for airborne assault units, and in terms of work in urban conditions, rubble and buildings, we in some sense intersect with the specifics of the police special forces (SOBR) and the special forces of the FSB. In the modern Armed Forces of the Russian Federation there is nothing similar to us (and with similar tasks).

5. What heavy equipment are the "stormtroopers" armed with?
The battalion has barrier and assault companies (from heavy equipment - BTR-82A armored personnel carriers and Typhoon-K armored vehicles) and companies of special heavy engineering equipment (engineering barrier vehicles - IMR-3, demining installations - UR-77 "Meteorite"). We are armed with robotic equipment (mine-clearing and firefighting robots), specially trained servicemen of the robotic equipment company work with robotics.

6. What small arms do assault units have?
From small arms, we currently have access to the AK-74 with underbarrel grenade launchers and AKS-74, PK, PKT (well, plus a 30-mm cannon on an armored personnel carrier). Of the desired - a sniper weapon is very necessary. But here the question is not so much about weapons, it is necessary to introduce snipers into our staff list. A group that approaches a building or ruins, and especially during operations in an urban environment, needs sniper support. This and losses in the group can prevent and the very progress to the point of "work" can be facilitated.

As for small arms, I would like to replenish our arsenal with AK "hundredth" series assault rifles. And, of course, we need a replacement for the legendary PM. He's the one in the state for me. And I would like to replace it with an APS (Stechkin automatic pistol).

7. If there was a choice not only from domestic pistols, but in general from any - what would you like to have with you in battle as a short-barreled personal weapon?
APS.

8. And from heavier weapons?
Possibly flamethrowers. There are certain plans for them, we are an experienced unit, and perhaps they will be implemented.

9. How are you doing with the connection?
We have all the novelties that appear in the Sun. I don’t see any problems with communication, including communication between the fighters of the assault group.

10. What are the "stormtroopers" equipped with?
I'll start with OVR-3Sh. The demining suit (assault version) is comfortable and thoughtful. Needs, of course, an individual fit, but this is normal. About weight and convenience, I will say this: all daylight hours today I was actively moving around the building in OVR-3Sh. Tired, of course, there is, but, without exaggeration, I am ready to pass the standards for physical training right now. Feelings of comfort come with time, the suit should “get used” to the person, then it works normally in it. In total, the suit has three sizes, but this is not the most popular option. There is a natural limitation - the "stormtrooper" should be of medium build. A big soldier is a big target and will not be able to crawl through everywhere, a small soldier may not have enough physical strength in battle to perform hard physical work.

The level of protection of the suit is determined by armor panels placed in special "pockets" on the chest, sides, groin, etc. What protection class they have is the same for the suit. We have panels of the 6th protection class, they shot at a suit with such a panel from SVD with an armor-piercing incendiary bullet from a dozen meters. Breakouts were not recorded. The visor on the helmet holds a pistol bullet. And, of course, fragments.


The molle straps on the suit are comfortable. They allow you to place the necessary equipment exactly where it is more convenient for you personally.

"Warrior". I approve. Except, perhaps, the location of the "unloading" on the chest. It must be moved to the hips, otherwise in fire contact it is impossible to minimize your own silhouette in the “lying” position, because you have to lie on the “armor” and compartments with magazines placed on top of the “armor”. In addition, if the unit is on a day or overnight stay, surveillance and security are provided, the soldier can take off his "armor" for the rest, without parting with the ammunition. In the "Warrior" this will not work. First you need to remove the unloading with ammunition and then the "armor". And one more detail: “unloading” well loaded with equipment and ammunition in its present form leads to excessive back fatigue when worn for a long time.

Multitools. There are regular and personal. It is not forbidden to have personally acquired. I personally have just such a one, I bought it even before the staff arrived. In general, I would say that the regular multi-tool is normal, it allows you to solve the whole range of tasks, but there are better tools. Life can depend on such an item of equipment as a multitool in our work, so I personally consider it wrong to save on a compact tool for myself.

Probably, not everyone knows that once a sapper from such tools had only a knife. During the war years in the Red Army, it was a Finnish-type universal knife, they did everything with it. In the post-war Soviet Army, it was already a folding knife "Demoman" with several blades. "Demoman" allowed something to be unscrewed, cut off (for example, a igniter cord), something to pierce, expose and strip the wire. With a modern multi-tool, there is more room for maneuver. Generally speaking, today without a multitool you can’t go anywhere, it’s like a third hand.

Machete. Or an assault knife "Sapper". Domestic. Cuts, cuts, sharpens easily. I won't say anything bad about him.

Supply in general. I note that we do not have a shortage of something. Among the regular allowances there are many new products. Somehow "upgrade" your property personally is not forbidden. This, by the way, allows again to sum up personal practical experience and broadcast it to the entire unit. One bought something, brought it, showed it, checked it in action - oh, you can take it! Reliable and functional thing never hurts. Again, no one canceled the duct tape, room for improvements and personal improvements. Of the things that are already obvious - we need hooks for automatic magazines. For the "Warrior" this is especially important: you put three magazines into each cell - it's not very convenient to get it out without a hook, and it can fall out in a hurry.

On the OVR there are special fixing elastic bands for magazines that allow you not to lose the magazine in motion. A trifle, but an important one. There are no such trifles on other pouches, we are modifying them for ourselves, because it is checked and convenient. There is an adopted third-party experience. In SOBR they spied: the "shieldman" on the left hand had spare magazines attached to the pistol with a bandage or tape. Itching to reload - you do it without taking your hands off the shield. We also have two types of shields in service - light and heavy. You can make three shields into one. The heavy shield is equipped with wheels, which can be very convenient in a building.

11. Who completes the assault units of the engineering troops?
And "contract" and "conscripts". When recruiting our battalion, it is customary to pay close attention to contract servicemen who have served urgent service or who previously served as "contract soldiers" in reconnaissance units and special forces, in the explosives. We greatly appreciate the skills they have previously acquired.

For me, as a company commander, a desirable candidate for a unit looks something like this: "contract worker", age - 20-25 years old, athlete, physically developed, strong build. Pay attention to height and weight. A plus for the candidate will be previously acquired skills of a sapper profile and a driver's license. It’s great if the candidate has already received a military specialty, for example, a machine gunner, a radio operator. And a very important aspect for me personally, as a commander, is the desire of the candidate to serve in our battalion. More than 30 people came to us, "selected contractors" in six months. It could have been noticeably more, but no one canceled the selection and screening.

Someone who wants to serve in an assault unit himself is easier to learn new things. In our country, every “contractor” at least knows how to shoot, drive an armored personnel carrier, handle explosives and provide first aid. And, of course, follow the safety rules.

12. How are things going with shooting training?
We pay special attention to shooting training, our practice is constant and systematic. An assault unit that is not capable of excellent shooting cannot, I think, be called an “assault unit”. The “attack aircraft” is obliged to master the standard weapon perfectly. The same applies to mine-explosive specifics. In addition, it is necessary, at a minimum, to be able to handle foreign samples of small arms. While we are being formed, not all samples have the opportunity to get acquainted “live”, we manage with electronic documents and plan notes, but work is being carried out in the direction of expanding and replenishing the material base specifically for us by the command.

13. Is there a shortage of personnel or certain specialists?
At the moment, I can’t say that we have a shortage of personnel. Our own "cadres" are working, and there are many who want to get into our service. The same applies to the "conscripts" soldiers, immediately after the KMB (course of a young soldier), the majority seeks to serve in our battalion. The motivation of the “conscripts” is different: someone is “according to rumors”, someone sees how and what we are doing in the course of daily combat training. She's a lot. Some are surprised that we have drill training. And how without it? This is the foundation of group warfare. Whoever is good in the ranks is also good in battle, a well-known fact from the time of Suvorov. To increase the level of coherence of the unit, the drill is indispensable. Fire, sapper, special, physical training - we have something to do in the service. I personally observe how a set of measures makes today's men out of yesterday's boys. Including with the help of morning physical exercises.

14. Physical training - is it just a struggle for "good sports shape" or are there any other super-useful aspects?
Our servicemen, in principle, have increased physical activity. However, over time, this “increased” level is leveled out due to personal growth, people are constantly developing and at some point in time you begin to regard high loads as normal. You just get stronger and more resilient. This is also an observation from personal experience.

15. How much does an "average contractor" earn in an assault unit?
On average, a “contract worker” receives about 30 thousand rubles, and if he is successful and persistent in terms of individual physical training, has (and can confirm) sports “classiness”, he is entitled to a cash bonus of 10-15 thousand rubles. Maintaining excellent personal fitness, as you can see, pays well. In such a matter as working on oneself personally, I consider the financial incentive very useful.

16. Is there something from the equipment that is not yet available, but would like to have specifically for the commander of an assault company?
UAV. We don’t have them yet, but personally, they make my job of making decisions based on operational intelligence much easier. I had experience of interacting with UAVs.

If we don’t touch on technology, I think that it would be very useful for us, as for a young unit with unique specifics, to be able to attract third-party experts and instructors. For learning. We are now actively forming a base of combat experience, here the instructor experience of "narrow" specialists from other units is invaluable to us. For example, I would like to master the nuances of actions in the mountains, in practice to study the experience of the same SOBR police officers in working in a building, instructors from the intelligence of the Special Forces would introduce their experience of actions in the forest. It all needs to be summarized, accumulated and adapted. Now we are filming our classes with subsequent “debriefing” and analysis. We study continuously. Again, let me remind you that our “contractors” who came from special units also become sources of new knowledge and, to some extent, play the role of instructors. This is just part of my job as a commander: highlight the main thing, summarize, adapt, accumulate and transfer to subordinates.

In this vein, in the near future, we plan to cooperate with the SSO (Special Operations Forces). From what I can tell you about this, it will be a practical course of versatile training conducted by the forces of the MTR instructors on the basis of the MTR for all our officers and "contract soldiers". Such a training course awaits, including me. It is great that we have such an opportunity, and it is very right that cooperation with the MTR is planned as permanent. After all, we were also created as a unit to perform special tasks within the framework of engineering and sapper topics.

17. If your unit would be given the task of "Take Koenigsberg!" - how would you act?
So right away, “on the knee”, in a couple of minutes planning the assault on Koenigsberg is not right. But if we are given a similar task, we will do it. Speaking in general: the personal armor protection of a fighter has advanced a lot since then, modern small arms, armored vehicles, demining installations - in general, Keninsberg of the last years of the war from today does not look absolutely impregnable. Moreover, our grandfathers took him without all of the above.

By the way, we studied the experience of both Chechen companies when we had to fight in low-rise urban areas. UR-77s were successfully used there. Why are human casualties needed when a fortified building with militants inside can be remotely thrown from UR-77 and only after that a cleansing operation is carried out by personnel. Although there was often nothing to clean up after the UR.

Sometimes it happens that you have to break into a building through a gap in the wall. Which is yet to be done. Here it is important to have maximum information about the building and the enemy: what kind of building, what approaches, who is inside, how many of them, what they are armed with. Based on these data, we determine tactics for a particular case: which of the groups in which composition works on the first floor, which on the second, who covers the central and emergency entrances and exits. Let's say, sometimes it's more convenient to enter simply through the door, and sometimes from above, breaking through the ceiling or roof. If the situation and the door allow - you can do without an explosion, hydraulic shears or a circular saw. In a nutshell and without specifics, you can’t really tell here. In the general case, one person under the cover of a group approaches the building, installs a charge (there are many different ones) and detonates explosives in one of the ways. Further assault through the breach or simultaneously through the breach and other entry points.

18. Suppose we are talking about a large one-story brick house, inside up to 30 people, presumably these are militants of the ISIS banned in the Russian Federation and, probably, they are all armed. How to be?
Fit UR-77. If there is no such equipment, then we will have specialists who can accurately “fold” the building. This is not the pinnacle of demolition skill, there are tasks and more difficult.

19. Is it true that demining is a thing of the past, and now everything that was mined is simply destroyed?
Yes, that's right, if we are talking about "neutralization" on the spot or the evacuation of an explosive device for subsequent destruction. A sapper is a highly qualified specialist, a vain risk is contraindicated for a specialist, he can still save someone's life. Why once again engage in neutralization when, without danger to others, you can destroy an explosive device with a water cannon, an overhead charge, destroy it on the spot with a directed explosion without subsequent detonation, and at least primitively and reliably pull it off with a “cat” or just shoot it? It's only in the movies that the wiring is cut when the brilliant "good guy" has to outplay the brilliant "bad guy."

But cases when it is necessary to neutralize on the spot or remove an explosive device for subsequent destruction also exist in practice. This is just a job for a highly qualified sapper associated with a risk to life. A huge amount of experience has been accumulated in this part of the experience, including from the time of the Great Patriotic War. And in modern engineering troops there are enough real geniuses in mine-explosive business.

20. What can you do useful in peacetime? Are engineering troops involved in, say, civil defense tasks?
Engaged as needed. We can conduct reconnaissance in the zone of natural disaster, accident or catastrophe. We can work as lifeguards. We can work as firefighters. We can provide first aid and evacuate. We can build a bridge and build a crossing. We can work underwater, we have our own divers. In general, we can save the lives of people in distress or in an emergency zone.

21. What do you consider a sign of professional excellence? Pilots, for example, perform complex aerobatics at low altitudes, snipers hit wristwatches from 300 meters, but what about “attack aircraft”?
A good attack engineer returns alive after successfully completing a combat mission.

Part two, photographic

I arrived at the unit still dark, before getting up.

I had breakfast in the soldiers' canteen.

For breakfast they were given millet porridge with gravy, chicken, lard, cow butter, bread, chicken egg, sweet tea, caramel, gingerbread, cookies, milk.

Salo and chicken in my plate in double size, finally found the first vegetarian in the army! A whole lieutenant colonel turned out to be.


Cabbage, carrots, beans, peas for breakfast to choose from. I couldn't eat everything, even though I was hungry. Breakfast, by the way, was enough for a whole day of running around the outskirts of Murom, the food is good, satisfying, although not the most delicious.

After breakfast, we went to get acquainted with military engineers from the obstacle and assault company. By prior arrangement, they had to demonstrate the process of putting on new protective equipment.


OVR-3Sh has three standard sizes.

Costumes are transported and stored in such bags. The round compartment is designed for a helmet.

The main components of the OVR-3Sh are laid out on the table: fragments of the cooling system, a lightweight jacket, trousers, a “sleeveless jacket” and a protective helmet are visible on the left.

The cooling system consists of two parts - jersey and underpants.

Lightweight flexible plastic hoses are sewn on the entire inner surface of the jersey and underpants.


Hoses drive water from such a tank using an electric motor. The battery lasts for about a day of work. The refrigerant is designed to be ordinary water with ice (with ice!?).

Generally speaking, I didn’t quite understand about ice: in winter it is in bulk, but a cooling system is not needed, and in summer where can I get it? It was not possible to find out how effectively ordinary water (without ice) will cool the user.

In any case, a system filled with drinking water can serve as a portable water supply.


The cooling system is put on with tubes to the body directly on the thermal underwear. The connectors for connecting to the water tank are visible.

No cooling system required in winter, worn for demonstration purposes only.

On top of thermal underwear and a cooling system (or without the latter), such a lightweight jacket is put on, in fact, these are just sleeves, while the jacket serves as a forced supporting element.

A lightweight jacket is more convenient to put on and adjust together, but the task is quite feasible for everyone alone. Lacing on the back does not allow the suit to crawl over the body, regulates the "stroke" of the arms and shoulders and overall comfort.

Pants are put on after the jacket.

The trousers are connected to the jacket with special snap-on straps, they are visible on the left in the picture.

It remains to put on a "sleeveless jacket" with shoulder pads.

On the sides, on the chest and in the groin of the suit there are special "pockets" for placing armored panels.
The panels can be different, in this case they have class 6 protection, they hold a shot at close range from an SVD with an armor-piercing incendiary bullet.

Shoulder protection works on the same principle, only it is flexible and not of such a high protection class. But it protects reliably from splinters, cuts and burns.

Armored helmet "Warrior Kiver RSP" with a visor. The visor holds a 9mm pistol bullet.

The visor on the helmet is removable. In the picture, it was fresh from the frost, so the room was fogged up. On the street fogged up much weaker, specially paid attention.

The shield made of three-layer plastic is heavy, superbly transparent, but it changes the center of gravity of the helmet.
Mounting points on the helmet allow you to place a variety of items on the helmet, such as a flashlight.

Communication, hearing protection and a connection node for a mine detector.

Attack aircraft engineer in OVR-3Sh. The helmet visor has been removed.

To demonstrate progress in the individual armor protection of the “stormtroopers”, a couple of modern replicas of the CH-42 steel breastplates were brought.
The cuirasses were specially made for demonstration purposes at one of the enterprises according to drawings and photographs, and one of the officers sewed the fastening elements and the “damper” with his own hands.

The steel helmet, apparently, is not the most authentic, but this will come with time. But the infantry shoulder blade with the stamp "1917".

PPS layout. It is strange to see such “remake” inscriptions on weapons made in the USSR. This also applies to our, domestic, "modelers".
Or is there some special valor in the emasculation (sometimes simply barbaric), albeit old, but military weapons? Or is it some kind of legal requirement?

By popular demand of interested parties, some photo details from the life of the NS-2 multitool and the Minesweeper assault knife.
A cover with a regular multi-tool is visible on the left fighter on his left thigh.

The use of the multitool for its intended purpose.

Multitool in a case. Table knife from the soldier's canteen for scale.

The case can be attached to a waist belt or equipment in several ways.

Assault knife "Sapper".

The scabbard with an assault knife is visible on the right thigh of the "stormtrooper".

The assault knife "Sapper" immediately attracted my attention with fairly common grammatical errors.
Just in case, I inform you that in the phrase "Armed Forces of Russia" all words should be written with a capital letter.
But in the phrase "Engineering troops" the word "troops" would be correctly written with a small letter.

I talked with Minesweeper users, they expressed themselves in the spirit that such a knife is useful and necessary, there are no complaints specifically about this product yet.
But a secret doubt crept in on me: I had amazing ownership experience and the use of a miracle survival knife, proudly bearing a similar "moose" brand.

A complete mystery for me was the image of the anchor on the plastic handle. Does anyone know what the anchor is for on the Minesweeper?

I tried to chop up an ancient log with Minesweeper a little. It didn’t seem very comfortable with a bare hand, the handle is narrow at the bottom, where the fingers are.
Wearing gloves is much more convenient.

On this, it is proposed to calm down with the equipment and move on to viewing photographs from the training of "stormtroopers" on the ground.

Instruction, construction. Two attack aircraft in OVR-3Sh, two in historical costumes from the Great Patriotic War (replicas of Amoeba camouflage and CH-42 bibs), four in Ratnik.

BTR-82A are placed at all entrances and exits in the brigade. In case of preventing a possible terrorist threat.

We plunged into the army "Ural" and arrived at the territory of the former weaving factory "Red Luch".
The sappers received weapons, blank cartridges and screwed bushings on the machine guns for blank firing.

The weaving mill, apparently, has long been abandoned by people and now serves as a training ground for training "stormtroopers".
It is convenient to work out the tactics of the assault group in the city ruins.

The foreman counts the cartridges, pouring them from the packs into his hat. A very common picture in the army.

Buildings of the former Muromsky KhBK Management Company LLC, or the Krasny Luch plant, which was part of the Russian Textile concern.
In 1900, paper looms started working here for the first time, but today the plant has turned out to be unprofitable and is now undergoing an unsurprising transformation from a classic "cast" to ruins.

Judging by the abundance of all kinds of inscriptions on the walls, Murom teenagers have already gone through a harsh school of life here.

While the sappers were discussing their plan of action, I walked around the building a bit. Around the traces of active, in the past, life.

Divided into combat "twos", we began training to storm the building. The fighters in the OVR-3Sh are the first to go, followed by the core of the assault group.

A couple of times the guys kindly walked around with weapons without “blank” bushings, especially for photographs. Further, just photos of the workflow for storming the city ruins.
All the money, as they say, is on the screen!

For those who have watched everything to the very end, there is a consolation prize. This is an individual army diet, menu 2.
The box was signed by the commander of the assault company and will go to the author of the most interesting question about the service of the assault unit of the engineering troops.
Expert opinions, comments and recommendations, as always, are welcome.

I will send a link to determine the winner and receive explanatory answers to a comrade of the guard, senior lieutenant. The winner will be announced on March 1 this year.

Engineering position company (IPR).

Engineering road company (IDR).

Company of engineering barriers (RIZ).

Engineer-sapper company (ISR).

The engineering and sapper company is designed to perform the tasks of setting up barriers and making passages in minefields.

The composition of the ISR:

2 engineer platoons;

Controlled mining platoon.

Armament of the ISR:

BGM drilling machine - 1 unit;

Cars Ural-43202 - 10 units;

Trailer 2-pm-4 - 3 units;

Chainsaw "Friendship" - 9 units;

IMP mine detectors - 12 units;

KRI reconnaissance kit - 6 units;

DSP-30 - 6 units;

PFM - 3 units;

PD-530 - 1 set;

PBU-50 - 3 units.

Capabilities of an ISR company (for 10-12 hours):

1. Install - 3-6 minefields;

2. Make 6-9 passes in minefields;

3. Arrange 1-2 barrier nodes;

4. Set 1-2 INP;

5. Prepare to blow up 2-3 bridges .

Composition of RIZ:

2 platoons of barriers;

1 remote mining platoon.

RIZ armament:

GMZ-3 - 3 units;

PMZ-4 - 4-3 sets;

Cars Ural-43202 - 12 units;

Trailer 2-PN-4 - 3 units;

Set of controlled minefield UMP-3 - 3 sets.

RIZ capabilities (for 10-12 hours):

1. Set up 2-3 guided minefields;

2. Allocate 2 mobile detachments of barriers;

3. Make and maintain 3-4 passes in minefields.

It is intended for equipment and maintenance of extension routes, building low-water bridges for loads of 60 tons.

The composition of the IDR:

2 road engineering platoons;

obstacle platoon;

A platoon of heavy mechanized bridges.

Armament of the IDR:

Tracklayers BAT-2 - 6 units;

TMM-3 set - 2 sets;

Installation UR-77-3 units.

IDR capabilities (for 10-12 hours):

1. Equip and maintain 2 road sections of 75 km each;

2. Equip 1-2 obstacle crossings;

3. Make up to 6 passages in the minefields of the enemy, directly during the battle (the length of the passage is 100m, the width is 6m).

Designed to perform tasks on fortification equipment of the defense area, positions, command posts, water supply to subunits and units.

The composition of the IPR:

2 engineering position platoons;

Platoon of engineering structures;

Department of water supply;

Paint department.

IPR armament:

Pit machine MDK - 3 units;

Trench machine BTM - 3 units;

Excavators EOV-4421 - 4 units;

Truck crane KS-2573 - 1 unit;

Set KVS-A (KVS-U) - 3 sets;

Filtration station VFS-10 - 1 set;

Sawmill LRV-2 - 1 set;

Lighting station AD-75-VS - 1 set;

Power plant ESB-8I-1 set;

Painting station POS - 1 set;

Power plant ED-16RAO - 1 set.



Possibilities of IPR (for 10-12 hours):

1. Equip 1-2 water supply points;

2. Equip 1-2 NP of the unit commander;

3. Dig 30 km of trenches and communications;

4. Open 20 covers for vehicles;

5. Prepare up to 50 m 3 of lumber;

6. Produce the manufacture of 50 linear meters. bridge meters per shift;

7. Equip 2-3 sets of crusher.

Designed to provide forced obstacles on floating bridges or with equipment for landing crossings.

Composition of PonR:

2 pontoon platoons;

A platoon of floating transporters;

Coastal department.

Armament PonR:

0.5 set of PMP park;

6 boats of the BMK-T type;

4 ferry-bridge machines;

BAT-2 - 1 unit;

PTS-2 - 6 units.

PonR opportunities (for 10-12 hours):

1 floating bridge with a length of 117 m for loads of 60 tons.

1 bridge with a length of 314 m for loads of 20 tons.

ENGINEERING COMPANY (ISR) - division b. security. It was intended to perform the tasks of an engineer, to ensure the battle of the regiment. Direct start. the company was the chief engineer, service of the regiment, who, in turn, was subordinate to the commander of the regiment. The structure of the ISR. l / s 59 people Of these, 4 officers, 3 ensigns, 12 s-comrade and 40 rows. It consisted of a control company and 3 platoons: engineering and sapper (ISV), engineering and technical. (ITV) and automobile (AV). Company management: 6 people. - 2 officers, 2 warrant officers, 2nd row. Commander of the company - 1 (kn). Deputy com. watered companies, units - 1 (st. l-t). Foreman of the company - 1 (senior great-to). Company technician - 1 (senior great-to). Driver of an armored personnel carrier - 1 (line). Radiotelephonist - 1 (line). Technique of the control company: BTR-60PB - 1. Armament of the control company: PM pistols - 4, AKM assault rifles - 2, KPVT machine gun - 1 (on an armored personnel carrier), PKT machine gun - 1 (on an armored personnel carrier). Communication services of the control company: r / s R-113 - 1 (on an armored personnel carrier), r / s R-107 - 1. WIS: 19 people in total. Of these, 1 officer, 3 s-that, 15 rows. Platoon commander - 1 (st. l-t, l-t). Weapon: pistol PM - 1. 1st engineer-sapper. department: department comr - deputy. platoon commander - 1 (st. s-t), driver - 1 (row), sappers - 4 (row). Weapons: AKM assault rifles - 6, RPG-7 grenade launcher - 1. Technical equipment: Ural-4320 car - 1, trailed min. minelayer PMZ-4 - 1, chainsaw "Druzhba" - 1.2nd engineer-sapper. department: department commander - 1 (junior s-t, s-t), driver - 1 (row), sappers - 4 (row). Weapons: AKM assault rifles - 6. Tech: Ural-4320 - 1 car, trailer, min. minelayer PMZ-4 - 1, chainsaw "Druzhba" - 1.3rd engineer-sapper. department: commander - 1 (ms, s-t), driver - 1 (row), sappers - 4 (row). Weapons: AKM assault rifles - 6. Tech: Ural-4320 - 1 car, trailer, min. minelayer PMZ-4 - 1, chainsaw "Druzhba" - 1. ITV: 19 people. Of these, 1 officer, 7 s-t, 11 rows. Platoon commander - 1 (senior l-t, l-t), field water supply laboratory assistant - 1 (senior s-t). Weapons: PM pistol - 1, AKM assault rifle -1.1st department of road vehicles: department commander - MTU-1 commander (junior s-t, s-t), driver MTU - 1 (row. ), Art. mech.-driver BAT-M - 1 (row.), mech.-driver BAT-M - 1 (row.). Weapons: PM pistols - 2, AKM assault rifles - 2, RPG-7 grenade launcher - 1, AKMS assault rifle - 1, DShK-M machine gun - 1 (on-board MTU). Technique: tank bridgelayer MTU - 1, tracklayer BAT-M - 1. Communications: r / s R-113 - 1 (onboard MTU). 2nd department road machines: commander MTU - 1 (junior s-t, s-t), mechanical driver MTU - 1 (row.). Weapons: PM pistols - 2, AKMS assault rifle - 1 (onboard MTU), machine gun DShK-M - 1 (onboard MTU). Tech-ka: tank, bridge layer MTU - 1. Communications: r / s P-113 - 1 (onboard MTU). 3rd department road. machines: commander MTU - 1 (junior s-t, s-t), mechanical driver MTU - 1 (row.). Weapons: PM pistols - 2, AKMS assault rifle - 1 (onboard MTU), machine gun DShK-M - 1 (onboard MTU). Tech-ka: tank, bridge layer MTU - 1. Communications: r / s P-113 - 1 (onboard MTU). Department of earth-moving machines: com-r otd-I - art. mech.-driver PZM - 1 (ml. s-t, s-t), mech.-driver PZM - 1 (row.). Weapons: AKM assault rifles - 2. Technique: PZM regimental earth-moving machine - 1. Field water supply department: com-r department - 1 (junior s-t, s-t), driver-minder - 1 (row. ), minder - 1 (row.). Weapons: AKM assault rifles - 3. Tech-ka: MAFS filtering station (VFS-2.5) - 1. TMM department: com-r of the department - st. mech.-driver - 1 (jr. s-t, s-t), art. mech.-driver - 1 (row.), Mechanics-drivers - 2 (row-e). Weapons: AKM assault rifles - 4. Tech: TMM-1 heavy mechanized bridge (4 vehicles). AB: 15 people Of these, 1 great-to, 2 s-ta, 12 rows. Platoon commander - 1 (st. prap-k), Weapon - PM pistol - 1. 1st automobile department: commander of the department - deputy. platoon commander - Art. driver - 1 (st. s-t), drivers - 8 (row-e). Weapons: AKM assault rifles - 9, RPG-7 grenade launcher - 1. Technical equipment: ZIL-131 cars with self-loaders - 9, 2PN-2 trailers - 9, KMT-6 trawls - 7, tank bulldozers, mounted BTUs - 9. 2 th car, department: commander - senior driver - 1 (jr. s-t, s-t), crane driver - 1 (row.), Drivers - 3 (row-e). Weapons: AKM assault rifles - 5. Tech-ka: truck crane 8T-210 - 1, Ural-4320 cars - 4, trailers 2PN-4 - 3, trawls KMT-5M - 3. Company engineering equipment: entrenching tool: small infantry, shovels - 21; large sappers, shovels - 35; drank two-handed - 10; carpenter's axes - 20; pick-hoe - 5; crowbars - 5. Light up, Wed: lanterns accumulate. AMF-8 - 1; KSF battery lamps - 4. Equipment for mining and demining: IMP mine detectors (RVM, RVM-2) - 9; demining kits KR-I - 3; miner cords - 9; device for fixing minefields - 1; will perform, control device, minefield KRAB-IM - 1. Camouflage equipment: camouflage kits of the MKT type - 22; camouflage overalls - 24. Plav, Wed: life jackets - 16; swim. suits MPK - 2. Weds for conducting demolition work: demolition machine KPM-1 - 1; kit 77-1; ohmmeters M-57 (linear bridge LM-68) - 2; bags of a demolition worker - 9. Equipment for extraction and purification of water: reservoir RDV-1500 - 1. Equipment for observation and reconnaissance: sapper rangefinder DSP-30-1; device for night work PNR - 1; periscope PIR - 1; binoculars - 3. Carried b / c: anti-tank. min - 600 pieces; anti-personnel. min - 8000 pieces; TNT in checkers - 500 kg.